Fixes during prime coat installation.
Air bubble roller popper for floor coatings. Concrete that has not been cured properly and is soft punky. Slowly stir partially filled containers to prevent entrapping excess air in the coating. Follow label and data page directions for the appropriate applicator. Rapid stirring for a prolonged period can introduce air bubbles into the paint that might persist in the dried paint coat.
Spike rollers can be used if bubbles appear but may not completely remove them. Various nap roller covers have air within them. Woven shed resistant rollers are recommended. Allow the coating to dry thoroughly then sand the coating smooth and repaint.
If air bubbles are present in coating allow to sit briefly before pouring on the floor. Epoxy floor coating problem solving guide page 10 prevention. We recommend saturating your 9 or 18 roller cover in the product and then rolling it and make it. Some people mistakenly assume that they appear later once the floor has cured.
If outgassing bubbles are seen during the primer application a metal porcupine roller can be used to pop the surface tension as bubbles start to develop. Apply paint gradually if using a roller. Bubbles sometimes form within the coating or on the backside of the coating film. Air moving in and out of the concrete slab with changes in temperature and barometric pressure.
This can often prevent the outgassing bubble from forming and allow the primer to fill in the pinhole that would otherwise be created. If you see bubbles forming in. For example moisture cured urethane mcu coatings that dry and cure by reaction with atmospheric moisture and other coating types i e aliphatic polyurethanes that are formulated with moisture sensitive components can also bubble. Avoid aggressive shot blasting.
This is wrong repairing bubbles once cured is very difficult or nearly impossible without needing to re coat. Eliminate any source of direct air blowing onto the surface. Effectively remove air bubbles from an epoxy coating using acetone spray technique. Always follow recommended nap and type of cover.
Always use a jiffy mixer and medium to slow speeds. After applying coatings with a squeegee you should never take a dry roller cover and roll out the floor. Follow directions for mixing and using primer. Another common reason for air bubbles in your floor coating is dry rolling the product.
If bubbles are seen while applying the primer a metal porcupine roller can be used to pop the surface tension as bubbles start to develop. Aides in flow out and leveling. Use this technique for removing air bubbl. These pinholes are caused by air bubbles formed in the epoxy coating during the application process.
Using a roller to pick out the bubbles from the floor.